Uncategorized
Progress inside and out at Wedgewood Lodge!
October 7, 2024
The Lobby is a construction office and materials storage
South east side of the garage and tower
View from below
Front entrance of 522 and the plaza viewed from new second floor balcony.
South side of the Tower building
Painting in progress along the townhomes on Four O’clock Road
Recycling garage
Kitchen of a unit in the tower
Balcony of 301 looks out to the Snowflake Lift, which is currently shielded from view by colorful autumn Aspen trees
Front entrances of 530 and 529
New siding
Demo on the back plaza
The south elevation of the tower on August 16
Baldy behind lower townhomes viewed through scaffolding on Tower
Lower townhomes are under construction, too!
North side of tower with new siding installation over Lobby entrance
Side of back townhome
Peak 8 behind new roof and building wrap
New windows and doors are installed in the Tower
Future site of the outdoor hot tubs and fire pit with the lower townhomes in the background.
View from above of unit 521 and the site of the hot tubs and firepit.
The renovations at Wedgewood Lodge are well underway
!
Check out pictures of our projects
and stay tuned for updates, details about the property, rooms, rates, and reopening.
Feel free to call us anytime (970) 453-1800 x0.