Recycling garageDemo on the back plazaBaldy behind lower townhomes viewed through scaffolding on TowerNew windows and doors are installed in the TowerBalcony of 301 looks out to the Snowflake Lift, which is currently shielded from view by colorful autumn Aspen treesFront entrance of 522 and the plaza viewed from new second floor balcony.North side of tower with new siding installation over Lobby entrancePainting in progress along the townhomes on Four O’clock RoadView from above of unit 521 and the site of the hot tubs and firepit.South east side of the garage and towerSide of back townhomeFront entrances of 530 and 529The Lobby is a construction office and materials storagePeak 8 behind new roof and building wrapKitchen of a unit in the towerView from below New siding South side of the Tower buildingLower townhomes are under construction, too!
Future site of the outdoor hot tubs and fire pit with the lower townhomes in the background.
The south elevation of the tower on August 16
The renovations at Wedgewood Lodge are well underway! Check out pictures of our projects and stay tuned for updates, details about the property, rooms, rates, and reopening. Feel free to call us anytime (970) 453-1800 x0.